Inputs to result
Net length = slab length − 2 × (edge clearance ÷ 12); net width = slab width − 2 × (edge clearance ÷ 12); lengthwise lines = floor(net width × 12 ÷ spacing) + 1; widthwise lines = floor(net length × 12 ÷ spacing) + 1; total linear ft = (lengthwise lines × run length with laps + widthwise lines × run width with laps) × (1 + waste% ÷ 100); stock bars = ceil(total linear ft ÷ stock length).