How the result is calculated
- 01
Cubic feet = length x width x (thickness / 12) - 02
Cubic yards = cubic feet / 27 - 03
80 lb bags = cubic feet / 0.60, rounded up
CONSTRUCTION
Calculate concrete volume in cubic yards and 80 lb bags for slabs, pads and rectangular footings. Enter your measurements below and the estimate updates instantly.
Formula, validation and worked example reviewed November 12, 2026. See our calculation methodology.
2.96 cu yd · 80 cu ft · Before extra waste
Approximate yield 0.6 cu ft/bag for QUIKRETE Concrete Mix No. 1101; verify your product. Whole bags rounded up from unrounded volume.
✓ Instant calculation on your device · Verify code-sensitive work locally
Volume and bag estimate
This concrete slab and yard calculator converts thickness from inches to feet, calculates volume in cubic feet and cubic yards, and estimates 80 lb bags using an approximate 0.60 cu ft yield per bag.
Ready-mix concrete is ordered in cubic yards (1 yd³ = 27 ft³), while slab thickness is almost always measured in inches. Convert slab thickness to feet by dividing by 12, multiply by length and width to get cubic feet, and divide by 27:
where:
Cubic feet = length x width x (thickness / 12)Cubic yards = cubic feet / 2780 lb bags = cubic feet / 0.60, rounded up1 cubic yard = 27 cubic feet (~45 × 80 lb bags at 0.60 cu ft/bag before waste).
| Slab Size (ft) | 4 in Slab (cu yd) | 4 in Slab (80 lb Bags) | 6 in Slab (cu yd) |
|---|---|---|---|
| 8 × 10 ft (80 sf) | 0.99 cu yd | 45 bags | 1.48 cu yd |
| 10 × 10 ft (100 sf) | 1.23 cu yd | 56 bags | 1.85 cu yd |
| 10 × 12 ft (120 sf) | 1.48 cu yd | 67 bags | 2.22 cu yd |
| 12 × 20 ft (240 sf) | 2.96 cu yd | 134 bags | 4.44 cu yd |
| 20 × 20 ft (400 sf) | 4.94 cu yd | 223 bags | 7.41 cu yd |
| 24 × 24 ft (576 sf) | 7.11 cu yd | 320 bags | 10.67 cu yd |
Multiply slab length by width by thickness in feet to get cubic feet, then divide by 27 to get cubic yards. Add a project-appropriate allowance before ordering.
A 10 ft × 10 ft slab that is 4 inches thick requires 1.23 cubic yards of concrete (33.3 cu ft). Ordering with 10% waste means planning for 1.35 to 1.5 yards, or 56 to 62 eighty-pound bags.
A 24 ft × 24 ft slab at 4 inches thick requires 7.11 cubic yards before waste (plan ~7.8 cu yd). At 6 inches thick for heavy vehicle parking, it requires 10.67 cubic yards (plan ~11.7 cu yd).
A cubic yard is 3 ft x 3 ft x 3 ft, which equals 27 cubic feet.
At an approximate 0.60 cu ft yield per bag, one cubic yard takes about 45 bags. Product yield can vary.
No. The calculator shows exact geometric volume before extra waste so you can choose an allowance suitable for the job.
You can calculate rectangular sections one at a time and add them. Use a shape-specific method for round or complex sections.
No. Published yields are approximate and product-specific. Check the bag or manufacturer data before buying.
Calculate exact concrete yards needed for driveways, patios, garage slabs and walkways with an automatic 10% spillage and grade-variation buffer.
A 10 × 10 ft patio slab at 4 inches depth equals 33.3 cu ft or 1.23 cubic yards. With a recommended 10% waste buffer, order 1.35 to 1.5 cu yd (or 56 to 62 eighty-pound bags).
A 12 × 12 ft slab at 4 inches requires 48 cu ft or 1.78 cubic yards. With 10% waste allowance, order 1.96 cubic yards (or 80 to 88 eighty-pound bags).
A 20 × 20 ft driveway slab requires 133.3 cu ft or 4.94 cubic yards. With 10% waste allowance, order 5.43 to 5.5 cubic yards from ready-mix dispatch.
A 24 × 24 ft slab at 4 inches needs 7.11 cu yd (order ~7.8 cu yd). If poured at 6 inches for heavy vehicles or equipment, it requires 10.67 cu yd (order ~11.7 cu yd).
Method references: QUIKRETE concrete estimating guide · QUIKRETE Concrete Mix data sheet