Concrete & Masonry

Paver Calculator

Calculate patio pavers, 4-inch gravel base, bedding sand, edge restraints, and cutting waste for patios and walkways.

Enter patio length, width, and select common paver dimensions. The calculator figures total pavers to order, gravel base tons, bedding sand tons, and perimeter edge restraints.

Calculation and worked example reviewed 2026-11-14. See our calculation methodology.

FREE access0 signup
Concrete & Masonry

Enter your measurements

US UNITS
YOUR ESTIMATE
990 pavers to order (4×8 in)200 sq ft patio · 60 ft perimeter

900 base pavers before 10% cutting & border waste (4.5 pavers/sq ft).

Subbase materials: ~4 tons crushed gravel (4" depth) · ~0.8 tons bedding sand (1" depth).

Formula and example

How this calculation works

This estimator converts your entered jobsite inputs (patio or walkway length, patio or walkway width, paver dimensions, gravel base depth, bedding sand depth, waste & cutting allowance) into consistent US trade units, computes the exact geometric baseline first, and then applies any selected waste or order allowance so you can verify both numbers before purchasing materials.

How does the paver calculator formula work?

Patio area = length × width; paver area = (length in × width in) ÷ 144; base pavers = patio area ÷ paver area; order pavers = ceil(base pavers × (1 + waste% ÷ 100)); edge restraint ft = 2 × (length + width); gravel base tons = (area × (gravel depth ÷ 12) ÷ 27) × 1.4 × 1.15; bedding sand tons = (area × (sand depth ÷ 12) ÷ 27) × 1.3.
(Paver Calculator)

where:

  • Patio or walkway length – Entered in ft (default reference: 20 ft);
  • Patio or walkway width – Entered in ft (default reference: 10 ft);
  • Paver dimensions – Entered in selected option (default reference: 4x8 );
  • Gravel base depth – Entered in selected option (default reference: 4 );
  • Bedding sand depth – Entered in selected option (default reference: 1 );
  • Waste & cutting allowance – Entered in % (default reference: 10 %);
The formula

Inputs to result

Patio area = length × width; paver area = (length in × width in) ÷ 144; base pavers = patio area ÷ paver area; order pavers = ceil(base pavers × (1 + waste% ÷ 100)); edge restraint ft = 2 × (length + width); gravel base tons = (area × (gravel depth ÷ 12) ÷ 27) × 1.4 × 1.15; bedding sand tons = (area × (sand depth ÷ 12) ÷ 27) × 1.3.

Worked example

Check the math

A 20 ft × 10 ft patio (200 sq ft) with standard 4 × 8 in pavers and 10% waste requires 900 base pavers (order 990). Base materials require ~4.0 tons of 4-inch compacted crushed stone and ~0.8 tons of bedding sand.

Quick lookup chart

Patio Paver Counts & Subbase Material Reference (4x8 Pavers, 4 in Base)

Estimates for common rectangular patios with 10% cutting allowance, 4 in gravel base, and 1 in bedding sand.

Patio DimensionsSquare Footage4 × 8 Pavers (w/ 10%)Gravel & Sand Needed
8 ft × 10 ft walkway80 sq ft396 pavers~1.6 tons gravel · ~0.3 tons sand
10 ft × 10 ft patio100 sq ft495 pavers~2.0 tons gravel · ~0.4 tons sand
12 ft × 16 ft patio192 sq ft951 pavers~3.8 tons gravel · ~0.8 tons sand
20 ft × 20 ft courtyard400 sq ft1,980 pavers~8.0 tons gravel · ~1.6 tons sand
Limits and field checks

Before you use this result

Assumes rectangular layout on a prepared level subgrade. Permeable interlocking concrete pavements (PICP), multi-size patterned kits, steep slope stabilization, and vehicular driveway loadings require specific bedding and base design.

  • Excavate subgrade 7 to 8 inches deep (4 in compacted gravel + 1 in bedding sand + 2-3/8 in paver thickness).
  • Compact gravel base in 2-inch lifts using a gas vibratory plate compactor; moisten gravel lightly before tamping.
  • Never compact bedding sand prior to laying pavers; screed it smooth and set pavers directly onto the loose 1-inch sand bed.
  • Install rigid plastic or aluminum edge restraints along all open borders secured with 10-inch steel landscape spikes.
Questions answered

Calculator FAQ

How many 4x8 pavers do I need for a 10x10 patio?+

A 10 ft × 10 ft patio is 100 square feet. Because each 4 × 8 in paver covers 0.222 sq ft (4.5 pavers per sq ft), you need 450 base pavers. Adding a standard 10% cutting waste brings the order to 495 pavers.

How deep should the gravel base be for a paver patio?+

According to ICPI (Interlocking Concrete Pavement Institute) guidelines, pedestrian patios and walkways require a minimum of 4 inches of compacted crushed aggregate (crusher run or road base) beneath 1 inch of uncompacted coarse bedding sand. Driveways require at least 6 to 8 inches of gravel base.

How much bedding sand do I need for pavers?+

Plan for a consistent 1-inch thick layer of coarse concrete sand (ASTM C33) screeded over the compacted gravel base. One cubic yard of sand covers roughly 300 square feet at 1 inch depth, weighing approximately 1.3 to 1.4 US short tons.

What is the best pattern to minimize paver cuts?+

A running bond or stack bond parallel to the patio edges produces the least amount of cutting waste (around 5% to 8%). Diagonal lay and 45° or 90° herringbone patterns create more perimeter cuts and typically require a 10% to 15% waste allowance.

Method references: ICPI: Interlocking Concrete Pavement Institute patio guide