Inputs to result
Material length = measured ridge and hip length × (1 + allowance% ÷ 100); bundles = ceil(material length ÷ installed coverage per bundle).
Roofing
Estimate hip and ridge cap shingle bundles from combined linear ridge and hip footage, cutting waste, and product coverage per bundle.
Enter combined ridge and hip lengths, a cutting allowance and the product's installed linear coverage per bundle.
Calculation and worked example reviewed 2026-11-12. See our calculation methodology.
20 linear ft effective coverage per bundle.
Verify the chosen cap product and hip details.
Formula and example
This estimator converts your entered jobsite inputs (combined ridge and hip length, cutting allowance, installed coverage per bundle) into consistent US trade units, computes the exact geometric baseline first, and then applies any selected waste or order allowance so you can verify both numbers before purchasing materials.
where:
Material length = measured ridge and hip length × (1 + allowance% ÷ 100); bundles = ceil(material length ÷ installed coverage per bundle).
A 60 ft ridge with 10% allowance needs 66 linear ft of cap. At 20 linear ft per bundle, plan 4 bundles.
Compares standard profile ridge cap (20–25 linear ft/bundle) vs. high-profile architectural cap (20 linear ft/bundle).
| Ridge + Hip Length | Length w/ 10% Waste | Bundles @ 20 lin ft | Bundles @ 30 lin ft |
|---|---|---|---|
| 40 linear ft | 44.0 ft | 3 bundles | 2 bundles |
| 60 linear ft | 66.0 ft | 4 bundles | 3 bundles |
| 90 linear ft | 99.0 ft | 5 bundles | 4 bundles |
| 120 linear ft | 132.0 ft | 7 bundles | 5 bundles |
Use the actual cap product coverage after exposure and overlap. Starter/termination pieces, ventilation and special hip details require separate planning.
Yes, when the same cap product and coverage apply to all the measured runs.
Follow the selected roofing system's product instructions; this calculator only estimates a stated cap coverage.